Digiplex Header Image

Locations & Specifications Summery - Ulven

Construction | Building Design | Power | HVAC | Elevators | Fire Protection | Security |
Fibre Infrastructure
| Roof Space & Parking | Accessibility

  Construction
The centre provides 4,405 m² of various grades of space sub-divisible down to 25 m² caged modules.
The base construction is from 1981, and has since benefitted from substantial refurbishment and infrastructure upgrades
Good space utilisation with generous internal column spacing
Heavy duty floor loading capacity, high capacity in key areas
Range of floor to ceiling heights up to 4.0 m available
   
  Building Design
Master plan caters for substantial conditioned module, office and associated spaces together with other space available for fit out to customer specification
Particular customer specifications can be incorporated including Electromagnetic Protection, fire suppression and special power supply arrangements
   
  Power
7.6 MVA  installed provision increasable to 12 MVA.
   
  Conditioned Power
Two x 2.2MVA dual output diesel rotary UPS systems, providing 1.8 MVA of UPS in “diverse” power configuration.
Scalable UPS building to a maximum of 4 MVA in 250KVA blocks providing either “diverse” power or “redundant” power supply systems to Customer modules.
Further modular UPS building to a maximum of 2.8 MVA in 350 KVA blocks providing “redundant” power supply systems to Customer modules.
-48 VDC redundant power
   
  Emergency Power
Two x 2.2MVA dual output diesel rotary UPS systems, providing 1.6MVA of short break power supplies with 24,000 litre fuel storage capacity.
Two x 2.2MVA diesel standby power generators supporting scalable UPS and short break supplies, with further 24,000 litre fuel storage capacity
Five synchronised 1.0 MVA diesel standby power generators supporting modular UPS and short break supplies, with further 24,000 litre fuel storage capacity
   
  HVAC
Conditioned modules are supported by six redundant 1 MW chillers feeding in-module redundant close control units. Total capacity 4.2 MW in a redundant configuration.
‘Free’ cooling chiller configuration capable of 100% cooling duty in Wintertime
   
  Fibre Infrastructure
Carrier neutral host to multiple independent fibre carriers
Provision of diverse underground fibre entry points
12 X 100 mm fibre ducts for access to three secure Carrier Connection Rooms with provision for a third diverse point of entry
   
  Elevators
Two passenger and goods service lifts, one with ‘high car’.
   
  Fire protection
High grade very early smoke detection apparatus in conditioned modules
Argonite fire suppression system in conditioned modules
Monitored automatic smoke detection throughout
   
  Security
On site 24 hour 365 day manned security presence
Security operates from purpose built security bunker
Internal and external advanced security surveillance camera systems
Intruder detection and card access systems throughout
High grade 360° perimeter fencing with secure access control
   
  Roof space & Parking
Substantial satellite / antennae space with good line of sight vantage
Secure surface parking for 54 cars
   
  Accessibility
City Centre: 6 km
Airport: 70 km
Airport Express: 6 km
Rapid Transit: 0.3 km