Construction |
 |
The centre provides 1,474 m_ of high grade high capacity ITH space sub-divisible down to 25 m_ caged modules. |
 |
The base construction is from 1985, and has since benefitted from complete refurbishment and infrastructure upgrades |
 |
Good space utilisation with generous internal column spacing |
 |
Heavy duty floor loading capacity, high capacity in key areas |
 |
Data module slab to ceiling height 3.75 m |
| |
|
| |
Building Design |
 |
Master plan caters for substantial conditioned module, office and associated storage spaces for fit out to customer specification |
 |
Particular customer specifications can be incorporated including Electromagnetic Protection, fire suppression and special power supply arrangements |
| |
|
| |
Power |
 |
5.5 MVA installed provision increasable to 7.5 MVA. |
| |
|
| |
Conditioned Power |
 |
Modular UPS building to a maximum of 4.0 MVA in 500 KVA blocks providing “redundant” power supply systems to Customer modules. |
| |
|
| |
Emergency Power |
 |
Two groups of three and one group of four synchronised 1.1 MVA diesel standby power generators supporting modular UPS and short break supplies, with 71,700 litre fuel storage capacity |
| |
|
| |
HVAC |
 |
Conditioned modules mechanically cooled by dual coil DX compressors with 'free' cooling in CCU with heat rejection to dual cooling water circuits and external aidiabatic dry coolers. Total capacity 3.5 MW in a redundant configuration. |
 |
‘Free’ cooling coil in CCU using 'free' cooled dry cooled water capable of 100% cooling duty in Wintertime |
| |
|
| |
Fibre Infrastructure |
 |
Carrier neutral host to multiple independent fibre carriers |
 |
Provision of diverse underground fibre entry points |
 |
Fibre ducts for access to two secure Carrier Connection Rooms |
| |
|
| |
Elevators |
 |
One 2,000 kg scissor lift at change in level |
| |
|
| |
Fire protection |
 |
High grade very early smoke detection apparatus in conditioned modules |
 |
Inergen fire suppression system in conditioned modules |
 |
Monitored automatic smoke detection throughout |
| |
|
| |
Security |
 |
On site 24 hour 365 day manned security presence |
 |
Security operates from purpose built security bunker |
 |
Internal and external advanced security surveillance camera systems |
 |
Card access systems throughout |
 |
Campus based zone within zone access control |
| |
|
| |
Roof space & Parking |
 |
Substantial satellite / antennae space with good line of sight vantage |
 |
Secure surface parking for 100's of cars |
| |
|
| |
Accessibility |
 |
City Centre: 15 km |
 |
Airport: 70 km |
 |
Airport Express: 15 km |
 |
Rapid Transit: 0.5 km |
| |
|