Construction |
 |
The centre provides 1,900 m_ of high grade ITH space with expansion up to 3,600 m_ sub-divisible down to 25 m_ caged modules. |
 |
The base construction is from 1987 and has since benefited from substantial refurbishment and upgrade. |
 |
Good space utilisation without internal columns |
 |
Heavy Duty floor loading capacity |
 |
Floor to ceiling heights 4.0 m |
| |
|
| |
Building Design |
 |
Master plan caters for substantial conditioned module, office and associated spaces together with other space available for fit out to customer specification |
 |
Includes infrastructure to meet Super Computer requirements |
 |
Particular customer power specifications can be incorporated. |
| |
|
| |
Power |
 |
7.0 MVA 11 kV internal distribution, increasable to 12.0 MVA |
| |
|
| |
Conditioned Power |
 |
Modular UPS providing “redundant” power supply systems to Customer modules. |
| |
|
| |
Emergency Power |
 |
Initially 4.0 MVA diesel standby power generators as N+1 with 18,000 litre fuel storage capacity |
 |
Master development plan designed to deliver 7 MVA diesel driven standby power generators |
| |
|
| |
HVAC |
 |
Service corridor mounted down flow units configured as N+2. Dual coil DX with 'free' cooling heat rejection to cooling water ring and external dry coolers. |
 |
‘Free’ cooling coil in CCU using 'free' cooled dry cooled water capable of 100% cooling duty in Wintertime |
 |
Masterplan contains N+N chilled water circuit for Hydro Clusters. |
 |
Water cooling outlets for Main Frame and super computer can be incorporated to customer requirement. |
| |
|
| |
Fibre Infrastructure |
 |
Carrier neutral host to multiple independent fibre carriers |
 |
Provision of diverse underground fibre entry points |
 |
Fibre ducts for access to two secure Carrier Connection Rooms |
| |
|
| |
Elevators |
 |
One goods lift |
| |
|
| |
Fire protection |
 |
High grade very early smoke detection apparatus in conditioned modules |
 |
Fire suppression system in conditioned modules |
 |
Monitored automatic smoke detection throughout |
| |
|
| |
Security |
 |
On site 24 hour 365 day manned security presence |
 |
Security operates from purpose built security office |
 |
Internal and external advanced security surveillance camera systems |
 |
Card access systems throughout |
 |
Campus based zone within zone access control |
| |
|
| |
Roof space & Parking |
 |
Substantial satellite / antennae space with good line of sight vantage |
 |
Secure surface parking for 100's of cars |
| |
|
| |
Accessibility |
 |
London Heathrow 18 miles |
 |
Central London via train 30 mins |
 |
Just off Junction 8 of M1. |
| |
|